Absolutely amazing is all I can say. The
night after the slab was poured, I came back out to check and see if anything
was done. As I rounded the corner on our block, I saw a really shadowy
figure looming in the distance. As I got close, I could make out
features... sure enough, they'd framed the entire two levels in one day.
The roof over the bulk of the house is still not there, and the stairs
aren't in (presumably to prevent me from getting upstairs to put the roof
up myself), but it's looking really good! The upper left pic is taken
from the master bedroom into the masterbath (see the tub?) and the master
bed closet.
The upper right pic is the master bedroom taken
from the guest bedroom across the hall. The reason there's so much
framing is that there's also a bathroom separating those two rooms.
The lower left pic is one of the two closets which are side by side yet
service their own individual guest rooms. Finally, the lower right
pic is one of the garage as taken from the middle of the kitchen area.
Sorry there aren't more from this day, it was pitch black out and I had
to rely on the flash from my camera.

|
 |